TURNKEY BIO-CNG EPC · NAPIER FEEDSTOCK · SATAT-READY

Nisseem India: Your Vision, Our Elite EPC.
Unlocking Commercial Bio-CNG Excellence.

We engineer, procure and construct commercial compressed-biogas plants end-to-end — from Napier-grass pre-treatment and anaerobic digestion to ≥99% CH₄ Bio-CNG at a 250-bar dispensing cascade, plus FOM/LFOM bio-manure recovery.

≥99%CH₄ product purity
4.8–45 TPDConfigurable capacity
9 stagesAnimated process lab
100%PESO & CPCB compliant
/ Explore

Everything about the plant, one click away.

⚙️ Animated Process Lab

Click through all 9 stages — live animated schematics with gas flowing through the plant, a digester cutaway, spinning compressors, plus Process / Engineering / Equipment / Safety tabs.

📊 Plant Data & Configurator

Select any capacity from 4.8 to 45 TPD and the full datasheet, mass balance and economics recalculate live.

🌱 FOM / LFOM

The second revenue line — digestate to FCO-grade bio-manure with MDA support of ~₹1,500/MT.

0%
Methane Purity
0%
Plant Uptime
0x
ROI Focused
0s
ESD Response
/ Who We Are

Technical mastery, engineered into every cubic metre of gas.

Nisseem India Private Limited is an elite EPC firm built for the commercial compressed-biogas era. We convert dedicated Napier grass, agricultural residue, municipal organics and industrial effluent into pipeline-grade Bio-CNG — profitably, safely, and at industrial scale.

Our engineers deliver plants that meet IS 16087 gas specification and clear PESO, CPCB and OMC inspection without rework — treating a biogas plant as a precision chemical facility, not a farm digester.

AttributeBio-CNG (our spec)Fossil CNG
SourceNapier grass / wasteNatural-gas wells
Methane content≥99%~88–95%
Carbon footprintNet-negativeFossil
Interchangeable?Yes — same engines & gridYes
Nisseem India

Process Mastery

In-house chemical & process engineers model methane potential, OLR/HRT and FOS/TAC balance before a single foundation is poured — yields are designed in, not discovered late.

Error-Free Delivery

HAZOP, LOPA and third-party FAT gate every work package. Plants pass the Performance Guarantee Run on the first attempt.

Full-Stack Integration

Civil, mechanical, E&I and automation under one accountable roof. One contract, one guarantee, one owner.

/ Why Invest

A market with law-mandated demand.

₹37,500 cr
Investment the CBO mandate unlocks by 2028-29
5,000
CBG plants targeted under SATAT (132 live)
15 MMT
Annual CBG production targeted
Assured
OMCs obligated to buy under SATAT + law

Structural tailwinds

Mandatory blending from FY 2025-26 · ~50% gas imports to displace · stubble-burning & landfill pressure · green finance & carbon credits.

Revenue streams

Bio-CNG (assured OMC off-take) · FOM/LFOM + MDA · food-grade CO₂ · carbon credits.

Blending ramp

CBG blend in CNG/PNG: 1%3%4%5%+ from FY28-29.

/ Elite Knowledge

Deep-stack engineering across every discipline.

Process, civil, mechanical, piping, electrical, instrumentation and automation — in-house and governed by a single EPC project-controls system.

  • HAZOP · LOPA · QRA safety studies on every project
  • NACE MR0175 sour-service material selection
  • Primavera P6 schedule & earned-value cost control
  • Bankable DPR/TEV with DSCR & IRR sensitivity
Feedstock
Napier + co-dig
Pre-treated, C:N 25–30
Digestion
CSTR
Mesophilic, OLR-optimised
Upgrading
Membrane + PSA
CH₄ ≥ 99%, IS 16087
Desulph.
< 5 ppm H₂S
Biological + iron-oxide
Compression
250 bar
Oil-free reciprocating
Control
SIL-2 SIS
2oo3, hot-standby PLC
/ Interactive Process Lab

The full 9-stage plant — live, animated, clickable.

Click any stage on the left (or a card below) to load its animated engineering schematic — gas flows through the pipes in real time. Then switch the Process · Engineering · Equipment · Control & Safety tabs for the full detail.

1
🌾

Feedstock

Napier reception

2
🔬

Pre-treatment

Break the fibre

3
🛢️

Digestion

Make biogas

4
🧪

H₂S removal

Desulfurise

5
🎯

Upgrading

CO₂ → ≥99%

6
💧

Drying

Dehydrate

7
⚙️

Compression

To 250 bar

8

Dispensing

Store & sell

9
🌱

FOM / LFOM

Bio-manure line

/ Configure Your Plant

Choose capacity, feedstock & commercial options — every number updates.

Pick a CBG capacity, one or more feedstocks (co-digestion supported) and the commercial options. The complete technical datasheet, mass balance and financial model below all recalculate from the same engineering basis, so every figure stays consistent with your choices.

Step 1 · Plant capacity (CBG output)
…or any size
Step 2 · Feedstock — select one or more (co-digestion)
Selected blend: Napier Grass · avg yield 92 Nm³/t · CH₄ in raw biogas 55% · HRT 35 d · pre-treatment: Required
Step 3 · Commercial options
Sell FOM / LFOM
Recover & bottle CO₂
Apply MNRE capital subsidy
CBG price
₹50/kg
₹55/kg
₹60/kg
4.8 TPD
Bio-CNG output (≥99% CH₄)
134
Feedstock required (t/day)
~₹48 Cr
Indicative project cost
~9 yr
Indicative simple payback
/ Technical Datasheet

Engineering basis for 4.8 TPD.

Derived from methane demand: CH₄ required → raw biogas at the blend's CH₄ fraction → feedstock at the blend's specific yield. Physically consistent at every capacity.

Process parameterAt your selection
Bio-CNG output~4.8 t/day
Annual CBG production~1,584 t/yr
CBG energy delivered~67 MWh/day
Raw biogas generated~12,316 Nm³/day
Feedstock intake~134 t/day
Annual feedstock~44,220 t/yr
CO₂ separated in upgrading~11 t/day
Plant parameterAt your selection
Digestate produced~114 t/day
FOM (solid bio-manure)~10 t/day
LFOM (liquid bio-manure)~26 t/day
Digester working volume~4,288 m³
Hydraulic retention time~35 days
Indicative plant area~6 acres
Indicative manpower~20 persons

Mass flow (per day)

StreamQuantityDestination
Feedstock in~134 tPre-treatment → digester
Raw biogas~12,316 Nm³Clean-up & upgrading
Bio-CNG (≥99%)~4.8 t250-bar cascade → OMC
CO₂ removed~11 tVent / food-grade capture
Digestate~114 tFOM + LFOM + recycle
FOM (dried)~10 tFarms (FCO)

Technical benefits

  • ≥99% CH₄ — well above the IS 16087 90% floor, so the gas is accepted at any OMC gate and can be injected into CGD grids.
  • >99% methane recovery — multi-stage membranes with recycle keep slip below 0.5%, protecting both yield and GHG performance.
  • H₂S < 5 ppm & dew point −40 °C — protects compressors, cascade and dispensers from corrosion and hydrate plugging.
  • SIL-2 safety & >95% uptime — 2oo3 gas detection, ESD, redundant compression and hot-standby PLC.
  • Closed nutrient & water loop — digestate becomes FOM/LFOM and clarified liquor returns to feed-prep (ZLD-ready).
/ Financial Benefits

What the plant earns and costs.

Indicative annual P&L for 4.8 TPD on Napier Grass at ₹55/kg. Every line responds to your capacity, feedstock blend and options above.

~₹9.9 Cr
Annual revenue
~₹8.7 Cr
Annual operating cost
~₹1.2 Cr
Indicative EBITDA
~₹43 Cr
Capex after subsidy

Revenue streams (₹ Cr / yr)

Stream₹ Cr/yr
Bio-CNG sales (OMC / SATAT)8.7
FOM / LFOM bio-manure (incl. MDA)1.2
Bottled CO₂ (if recovered)0.0
Total revenue9.9

Operating cost (₹ Cr / yr)

Cost head₹ Cr/yr
Feedstock (largest opex)6.2
Power & utilities1.0
Manpower0.1
O&M, consumables & spares1.4
Total opex8.7

Project economics

Total project cost (capex)47.5
MNRE capital subsidy (CFA)4.0
Net capex after subsidy43.5
EBITDA (revenue − opex)1.2
Simple payback— yrs

MNRE CFA modelled at ₹4 Cr per 4.8 TPD, capped at ₹10 Cr/project. Simple payback = net capex ÷ EBITDA; excludes financing, tax, depreciation and working capital.

Financial benefits of the model

  • Assured off-take — OMCs are obligated buyers under SATAT and the CBG blending mandate, so volume risk is low.
  • Three revenue lines — CBG plus FOM/LFOM (with ~₹1,500/MT MDA) and optional food-grade CO₂ materially lift EBITDA.
  • Capital support — MNRE CFA plus priority-sector lending cut the equity cheque and improve DSCR.
  • Feedstock economics dominate — toggle between feedstocks above and watch payback move; cheap residues beat energy crops on cost, energy crops win on security of supply.
  • Concessional tax & GST — 5% GST on CBG and accelerated depreciation on plant & machinery.
Indicative only — order-of-magnitude figures for comparison between configurations, not an offer or a valuation. Feedstock gate price and CBG realisation are the two biggest swing factors. Confirm everything in a stamped DPR / TEV before investment.
/ Impact

What this plant displaces.

~4,752 t
CO₂e avoided per year (indicative)
~44,220 t
Organic waste / biomass valorised per year
~240
CNG buses fuelled per day
~3,300 t
Organic manure returned to soil per year
/ Feedstock Options

Eight proven feedstocks — pick what your site can secure.

A Bio-CNG plant is only as good as its feedstock. Each option below changes yield, digester sizing, pre-treatment, capex and — most of all — operating cost. Click Use this feedstock on any card to load it into the configurator and see the full technical and financial impact.

Side-by-side comparison

Yields are per tonne of fresh feedstock as received and are indicative field values; actual figures depend on total/volatile solids, seasonality and pre-treatment. Gate prices vary widely by region and contract.

/ Byproduct — FOM & LFOM

The second product: Fermented Organic Manure.

Digestate isn't waste — it's a bankable co-product. Screw-press / decanter separation yields a solid cake (~20–25% TS) cured, dried and bagged as FOM to the Fertiliser (Control) Order 1985/2021, plus a liquor stream concentrated into LFOM and largely recycled as process water (ZLD-ready).

  • Second revenue line — sold to farms & fertiliser companies.
  • Market Development Assistance ~₹1,500/MT (SATAT / GOBARdhan).
  • Returns organic carbon & NPK to soil — strong ESG story.
  • FCO fertiliser registration; effluent to CPCB/SPCB norms.
See the animated FOM/LFOM schematic as Stage 9 in the Process Lab.
FOM · TOC
≥ 14%
Total organic carbon
FOM · Moisture
15–25%
Per FCO schedule
C : N
< 20 : 1
Matured manure
MDA
₹1,500/MT
Market Dev. Assistance
LFOM
FCO 2021
Liquid biofertiliser
Water
Recycled
ZLD-ready loop
/ O&M · Utilities · Compliance

Run it safely, clear every gate.

Utilities & Balance of Plant

Grid + DG power, MCC/PCC, VFDs · IBR boiler (steam/hot water) · raw + recycled water · instrument/plant air, N₂ · flare, firefighting, gas detection · weighbridge, QC lab, ZLD.

Manpower & O&M

3-shift 24×7 crew · SCADA/PLC + predictive maintenance · AMC for compressors & upgrading skids · consumables: enzymes, desulph. media, membranes, nutrients.

Process Safety

HAZOP · LOPA · QRA · hazardous-area (Zone 1/2, IIA/IIB) · SIL-2 SIS with 2oo3 voting · ESD & flare · H₂S electrochemical detection.

Environment · Safety · Gas

ApprovalAuthority
Consent to Establish / OperateSPCB / PCB
Environmental clearance (if triggered)SEIAA / MoEF&CC
Groundwater NOCCGWA
PESO — compression & 250-bar storagePESO / CCOE
Gas Cylinder Rules 2016 · SMPV(U)PESO
Fire NOC · OISD-179State Fire Dept

Product · Scheme · Statutory

ApprovalAuthority
CBG quality — IS 16087BIS / OMC
FOM / LFOM fertiliser registrationFCO 1985/2021
SATAT LOI + OMC off-takeIOCL/BPCL/HPCL/GAIL
CBG blending registration (CBO/CRB)MoPNG · Central Repository
Factory license · Boiler (IBR)Factories Dept · IBR
Electrical inspectorate (CEIG)CEIG
/ Project Timeline

EPC delivery — concept to commissioning.

Typical 18–24 months; phases overlap under fast-track EPC, approvals run in parallel.

M0M6M12M18M24
/ Connect

Ready to turn your feedstock into a bankable Bio-CNG asset?

Share your site, feedstock and off-take plan. Our engineers will return a feasibility view and indicative DPR framework — no obligation.

Already working with us? Sign in to the client portal →